The Meadows and Buchan Street

The Meadows

Two existing community facilities are being replaced with a modern, highly sustainable community hub, along with brand new council rented apartments, new open space, a public plaza, and retention of a café and shop space.

 

The Meadows site will provide 78 new one and two bedroom apartments for council rent and the Buchan Street site will see 28 one and two bedroom council rented flats built. Four of the flats at The Meadows and one at Buchan Street will be for wheelchair users. 

 

The new developments will offer high levels of sustainability with the community hub designed to BREEAM Excellent, which is in the top 10% of non-domestic buildings in the UK. The Cambridge Local Plan targets 19% carbon reduction on 2013 Building Regulations and both sites will achieve around 60% in carbon reduction, significantly exceeding local plan requirements.  

 

In addition there will be electric charging points for cars, 230 cycle spaces across the two sites, underground recycling bins and green roofs, with solar photovoltaic panels and gas free heating as the main energy sources. 

 

A net total of 109 new trees will also be planted, and as well as retaining the zip wire and trim trail, a new MUGA (multi-use games area), an improved free-draining FA approved football pitch, new play areas, and a new skate ramp will be provided at the recreation ground, replacing the current provision. 

 

93.6% of the open space will be retained and enhanced meadows and woodland areas will also mean an overall improvement of 65% in biodiversity for the open space.

 

The Meadows
Buchan street
The Meadows